Design Build Bridges

The project consisted of the design, supply and fabrication of two temporary bridges, one for vehicle/pedestrian traffic going east and one for going west. Work for the first bridge included the erection of 15.2m x 4.2m steel girder bridge complete with a precast concrete deck, abutment walls, footings as well as the installation of guardrails and chainlink fencing. The second bridge, which was also a steel girder structure with guardrails, precast concrete deck and chain link fencing, was installed approximately one month later.

Start Date: January 2007
End Date: March 2007
Engineer: QR Engineering Ltd.
Contract Value: To be announced
Key Staff:
Nigel Bester - President
Rhonda Stemmler - Vice President
Shawn Kelly - Superintendent, Bridge #1
Ken Oxley - Superintendent, Bridge #2
Steven Wilson - Project Manager
Angela Bester - Safety Coordinator